However....we are not done yet!
Your help is still needed to finish some repairs and rebuilding around the camp. The flood destroyed all of our footbridges that were in place to cross the creeks at key areas around the camp...those crossings no longer exsist and still are not in place for the 2011 season. The swimming dock was destroyed, in which a beach area was made and is a great hit, but the big kids would like something they can jump off of into the water (like a floating dock of some sort perhaps). We are also beginning to see moisture damage within the kitchen area of where the water ran under the building. Until the Rec Hall footbridge is in place the Rec Hall bathrooms will remain non-operational to the groups who come and use that facility.
These large expenses are not covered within NaCoMe's year to year operational budget. NaCoMe's operations are solely funded through its reatreat groups and through the generousity of churches, camp friends, and other user groups. Temporary bridges remain in place at this time. But NaCoMe needs your assistance to help put back and repair what was lost and damaged in the flood. Below is a listing of what the costs are for fixing and rebuilding around the camp. Please prayfully consider lending your camp a hand in putting things back in place. Thank you in advance for helping take care of YOUR camp!

Rec Hall Bridge Demolition
NaCoMe Footbridge Rebuild/Replacement Project
*Rec Hall Footbridge : $12,000
*Playground Earthen Bridge Access: $4,000
*Main Creek Footbridge : $10,000
Craft Shack Footbridge : $7,000
Fire Circle Footbridge : $6,000
*Designates new Bridge in new location
All donations are tax deductible, you will receive a letter for your records as a receipt for you generous gift.
We will update the numbers as we receive donations and as more estimates are gathered for repairs.